Turaif Airport
City: Turaif
Sector: Airports & Aviation
Status: Completed
Overview: This project reflects Borooq Al Arabia’s capability in delivering systems within sites that require high operational readiness, clear response frameworks, and maintenance planning to support continuity
Challenge: The project required a high level of operational readiness while maintaining clarity in handover procedures and documentation.
Solution / Execution Methodology:
The works were executed through a structured sequence starting with defining scope and operational requirements, followed by phased implementation, inspection, testing, and the preparation of documentation deliverables that support clear and efficient handover.
Handover Deliverables / Execution Outcome:
Works executed in accordance with the approved scope
Support for testing and system operation
Clear and structured technical reports
Checklists and closure of observations
As-built drawings (as required)
Handover documentation and optional basic training upon request
